utilities

Capisic Park Pond

|

capisic_4.jpg

capisic_2.jpg

capisic_1.jpg

capisic_3.jpg
  • Scope of Work:

    Removal of old concrete bridge built in 1941. Installation of new bridge, in pre-cast sections. New road, sidewalks, and granite curb.

  • Unique Challenge:

    Waterflow had to be bipassed durring the removal, and installation of the new bridge in sections.

  • Owner:

    City of Portland

  • Engineer:

    Sebago Technics

  • Schedule:

    August - September 2006

  • Location:

    Lucas St., Portland, ME [map]

Falmouth Street, Westbrook

|

fal_st_1.jpg

fal_st_2.jpg
  • Scope of Work:

    Installation of over 6,000 linear feet of sanitary sewer and services, over 5,000 linear feet of storm drainage, and 80 sewer and drainage structures. Full depth removal and replacement of existing sub base, pavement and granite curbing.

  • Unique Challenge:

    Complete entire job without disrupting residential neighborhood.

  • Owner:

    City of Westbrook, ME

  • Engineer:

    Millette and Associates

  • Location:

    Falmouth Street, Westbrook, ME [map]